Location 9 |
|---|
| Posted: 1/30/2012 16:47 Design Volume: No data Operational Volume: -596,500 Scheduled Volume: -140,087 % Utilized: 23% |
| Location 7 CIG from Greasewood, CO |
|---|
| Posted: 1/30/2012 16:47 Design Volume: No data Operational Volume: -206,627 Scheduled Volume: -110,659 % Utilized: 54% |
| Location 8 Entrega Pipeline |
|---|
| Posted: 1/30/2012 16:47 Design Volume: -1,337,000 Operational Volume: No data Scheduled Volume: -1,004,559 % Utilized: 75% |
| PIPELINES > CURRENT THROUGHPUT > DETAIL VIEW: WAMSUTTER, LOCATIONS 7-9 |
ROLL OVER THE LOCATION NUMBER TO VIEW EXPORT/IMPORT VOLUME INFORMATION |
|