Location 9 |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: -592,000 Scheduled Volume: -23,591 % Utilized: 4% |
| Location 7 CIG from Greasewood, CO |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: -195,000 Scheduled Volume: -155,329 % Utilized: 80% |
| Location 8 Entrega Pipeline |
|---|
| Posted: 8/24/2008 21:43 Design Volume: -1,000,000 Operational Volume: No data Scheduled Volume: -667,824 % Utilized: 67% |
| PIPELINES > CURRENT THROUGHPUT > DETAIL VIEW: WAMSUTTER, LOCATIONS 7-9 |
ROLL OVER THE LOCATION NUMBER TO VIEW EXPORT/IMPORT VOLUME INFORMATION |
|