| Location 2 Wyoming Interstate Gas (including Medicine Bow Lateral) |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 1,880,000 Scheduled Volume: 1,863,863 % Utilized: 99% |
| Location 1 Colorado Interstate Gas Pipeline |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 510,000 Scheduled Volume: 510,000 % Utilized: 100% |
| Location 3 Cheyenne Light, Fuel, and Power (6 and 16 inch) |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: -68,000 Scheduled Volume: -48,000 % Utilized: 71% |
| Location 4 Southern Star Central Gas Pipeline |
|---|
| Posted: 8/24/2008 21:43 Design Volume: 194,750 Operational Volume: No data Scheduled Volume: 186,811 % Utilized: 96% |
| Location 5 WestGas Interstate Pipeline |
|---|
| Posted: 8/24/2008 21:43 Design Volume: -13,300 Operational Volume: No data Scheduled Volume: -13,300 % Utilized: 100% |
| Location 23 Kinder Morgan Interstate |
|---|
| Posted: 8/24/2008 21:43 Design Volume: 122,500 Operational Volume: No data Scheduled Volume: 121,486 % Utilized: 99% |
| Location 24 Rockies Express |
|---|
| Posted: 8/24/2008 21:43 Design Volume: 1,800,000 Operational Volume: No data Scheduled Volume: No data % Utilized: No data |
| Location 25 Cheyenne Light Fuel and Power (6 and 16 inch) |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 68,000 Scheduled Volume: 48,000 % Utilized: 71% |
| Location 26 Trailblazer |
|---|
| Posted: 8/24/2008 21:43 Design Volume: 846,263 Operational Volume: No data Scheduled Volume: 870,024 % Utilized: 103% |
| Location 27 WestGas |
|---|
| Posted: 8/24/2008 21:43 Design Volume: 13,300 Operational Volume: No data Scheduled Volume: 13,300 % Utilized: 100% |
| Location 28 Colorado Interstate Gas (12 and 24 inch) |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 600,000 Scheduled Volume: 469,870 % Utilized: 78% |
| Location 29 Cheyenne Plains |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 865,000 Scheduled Volume: 857,101 % Utilized: 99% |
| Location 30 Xcel Energy Front Range Pipeline (8 and 24 inch) |
|---|
| Posted: 8/24/2008 21:43 Design Volume: No data Operational Volume: 420,000 Scheduled Volume: 420,000 % Utilized: 100% |
| PIPELINES > CURRENT THROUGHPUT > DETAIL VIEW: CHEYENNE, LOCATIONS 1 - 5 & 23 - 30 |
ROLL OVER THE LOCATION NUMBER TO VIEW EXPORT/IMPORT VOLUME INFORMATION |
|